Skip to content
Blog Careers Google Partner 12+ Years · 5000+ Projects

Manufacturing ERP Software Development for Indian Factories

A job card that never came back from the shop floor, a heat number nobody wrote down, a job-work challan that is eleven months old. We build manufacturing ERP software around the way your plant actually runs: orders, BOMs, production, stores, job work, quality, maintenance and dispatch, with GST e-invoices, e-way bills and Tally kept in step.

In business since 2013
5000+ projects, 1200+ clients
4.9★ Google rating
Clients in 15+ countries

Storekeeper counting machined parts in a bin while a production planner holding a tablet stands beside him

In short

Manufacturing ERP Software at a Glance

Manufacturing ERP software is one system that links a factory’s sales orders, bills of materials, production planning, stores, purchase, job work, quality checks, maintenance and dispatch to its accounts. Swadhin IT Solutions (SITS India) builds it for Indian manufacturers with 20 to 500 staff, including GST e-invoicing, e-way bills, ITC-04 job-work records and Tally integration.

What it covers
Orders, BOM and routing, planning and MRP, stores, purchase, job work, quality, maintenance, dispatch
Who it’s for
Engineering, steel, plastics, packaging, food and chemical plants, and job workers
Compliance handled
GST e-invoice, e-way bill, ITC-04 job-work data, EPR quantity records, edit logs
Works with
Tally, weighbridges, barcode and QR labels, machine counters, Android apps
How we build it
Shop-floor discovery, one pilot line, a parallel run, then plant-wide go-live
How to start
+91 70085 62317 or WhatsApp us

Which Manufacturing ERP Modules Should a Plant Start With?

Most plants begin with the three or four modules where money or material leaks today. Each module can start on its own.

Sales Orders & Delivery Promises

Quotations become orders with a promised date and the customer’s drawing revision. Before sales confirms a date, the order is checked against stock and machine load. Partial dispatches and back orders stay visible until the last piece ships.

BOM & Routing

Multi-level bills of materials (BOM), the list of parts and raw material in one finished item, with alternate materials and revision history. Routing lists each operation, its work centre and standard time. Change a drawing once and every open job picks up the right version.

Production Planning & MRP

Material requirements planning (MRP) nets each order’s BOM against stock, open purchase orders and material lying with job workers, then lists what to buy and when. The production plan loads machines shift by shift. For live machine status and operator entries, the ERP connects to a shop-floor system.

Manufacturing execution system (MES) development

Stores, Batches & Scrap

Goods receipts, bin locations, and issue only against a job card. Batch, lot or heat numbers follow material from the supplier’s certificate to dispatch. Scrap, rejects and saleable by-products are weighed and valued instead of vanishing into “consumption”.

Warehouse management system (WMS) for larger stores

Purchase & Vendor Bills

Indent, purchase order, goods receipt and vendor bill are matched line by line. A bill that differs from the PO in rate or quantity waits for approval instead of going straight to payment.

Procurement and purchase management software

Job Work & ITC-04

Every delivery challan to a job worker, every return and every process loss is recorded against the original lot. The software ages each lot, so material nearing its return deadline shows up months ahead. The challan data feeds your ITC-04 filing.

Quality Control

Incoming, in-process and final inspection plans, with results stored against the batch or heat number. Failed material goes on hold and cannot be issued or dispatched until released.

Quality management system (QMS) software

Plant Maintenance

An equipment register with preventive schedules by days, running hours or output. Breakdowns are logged with cause, downtime and spares used. Statutory due dates, such as a boiler certificate or weighbridge re-verification, sit on the same calendar with reminders.

Dispatch and accounts close the loop: packing lists, e-invoices and e-way bills come from the order, and entries flow to Tally or the ERP’s own books. Weighbridges, barcode printers and machine counters connect where the data starts, and supervisors enter output from an Android phone.

Where Does the Software Fit Your Plant’s Day?

Most leaks happen between departments, where one register ends and the next begins. That is where production planning software and the rest of the ERP earn their keep.

Stage What goes wrong today What the software records or automates What the owner sees
Order booking Sales promises a date without checking material or machine load Order with promised date, linked BOM and a capacity check Order book by due date, with orders at risk flagged
Material planning A shortage is found only when the job reaches the machine Net requirement against stock, open POs and job-work stock Shortage list a week before it stops a line
Purchase and inward Bill rate or quantity differs from the PO and gets paid anyway Three-way match of PO, goods receipt and bill Mismatched bills held for approval
Production Paper job cards; output and scrap reach the office a day late Output, rejection and scrap per operation and shift Daily output, scrap and work-in-progress by line
Job work Nobody can say what is still lying at each job worker Challan out, receipt back, process loss and lot age Lots close to their return deadline; ITC-04 data
Quality Test results sit in a register, not tied to a batch Inspection results per batch or heat, with hold and release Rejections by supplier, machine and shift
Maintenance The same breakdown repeats; a certificate expiry is noticed late Preventive schedule, breakdown log, spares and due dates Overdue jobs and certificates due in the next 30 days
Dispatch and billing The invoice is typed twice, once in a sheet and once in Tally Packing list, e-invoice, e-way bill and the Tally entry Dispatch against orders, and receivables by customer

Our view: with a few dozen products, single-level BOMs, one store and no job work, Tally’s inventory features and a planning sheet are enough. Multi-level BOMs, material at job workers or scrap from several shifts make the spreadsheet the bottleneck. Build stores and planning first; every other module depends on those numbers.

Who Is Manufacturing ERP For?

Manufacturing ERP suits engineering and metal units, plastics and packaging makers, food and chemical processors, and job workers. Even so, ERP for a small manufacturing company looks different from plant to plant. A fabrication shop in Rourkela and a snack-food unit near Cuttack both need stock and orders, but almost everything else changes.

Engineering & fabrication shops

  • Drawing-wise BOMs with revision control
  • Operation-wise job cards and machine loading
  • Actual job cost compared with the quotation

Steel, sponge iron & metal units

  • Heat or lot numbers from raw material to dispatch
  • Weighbridge-linked inward and outward entries
  • By-products and scrap valued separately from output

Plastics & packaging makers

  • Mould-wise production and mould maintenance
  • Regrind, rejects and resin consumption per batch
  • Plastic packaging quantities by category for EPR returns

Food & agro processors

  • Recipe BOMs with expected yield and actual yield
  • Batch and expiry tracking, first-expiry-first-out issue
  • Seasonal raw material buying and storage

Chemicals & formulations

  • Batch recipes that scale with batch size
  • QC approval before any batch is released
  • Batch records you can pull up for a customer audit

Job workers & ancillary units

  • Customer-owned material kept apart from your own
  • Challan-wise receipts, returns and process loss
  • Reconciliation statements your principals ask for

Discrete plants count pieces, process plants measure batches and yields, and job workers hold other people’s stock. Most plants are a mix, and the design starts there.

Which Compliance Rules Does the ERP Handle?

As of November 2026, the ERP supports GST e-invoices, e-way bills, job work time limits, ITC-04, plant certificates and an edit log. Limits and dates change by notification, so the ERP keeps them as settings. This is general information, not tax or legal advice; check your case with your CA.

  • GST e-invoice. Businesses whose aggregate turnover crosses the notified limit must register each B2B invoice on the Invoice Registration Portal (IRP), which returns an Invoice Reference Number (IRN), a signed e-invoice and a QR code, according to the GST e-Invoice System. The ERP sends the invoice and prints the IRN and QR code on your bill.
  • E-way bill. The e-way bill system covers movement of goods above the notified value, both for supply and for reasons other than supply, such as sending material out for job work. The ERP fills the e-way bill from the dispatch or challan.
  • Job work time limits. Section 143 of the CGST Act requires inputs sent for job work to come back, or be supplied from the job worker’s premises, within one year, and capital goods within three years. Moulds, dies, jigs, fixtures and tools are excluded. Material that misses the deadline is treated as supplied on the day it went out.
  • ITC-04. Form GST ITC-04 reports goods sent to and received from job workers, including losses and wastes. The GST portal’s ITC-04 manual says that since 1 October 2021 it is filed half-yearly by larger taxpayers and annually by others, based on the previous year’s aggregate turnover.
  • Plant certificates. Under the Boilers Act, 2025, in force from 1 May 2025, a boiler may be used only while its certificate is valid. Weighing instruments used in trade, including weighbridges, must be re-verified by the Legal Metrology department by the due date on their last certificate.
  • Edit log. Every change to a bill, goods receipt or stock entry is logged with the user and time, so your auditor can see who changed what.

What Should You Check Before Choosing Manufacturing ERP Software?

Check how each vendor handles your own items, job work, traceability, scrap, Tally, shop-floor entry, data ownership and month-end support. Ready-made products such as ERPNext, Odoo and SAP Business One suit plants whose process matches their standard flow, and they are quicker to start. Custom software pays off when your process is why customers come to you: unusual routings, two-way job work, by-products or customer-specific inspection. Take these checks to every vendor, us included.

  • 1. A demo on your own item. Give the vendor one real product with its multi-level BOM and routing, and watch it go from order to dispatch.
  • 2. Job work handled properly. Ask to see a challan go out, part of the lot come back with process loss, and the ITC-04 data that results.
  • 3. Batch or heat traceability. Pick a dispatched lot and ask the system to show which raw material batches went into it, in under a minute.
  • 4. Scrap and by-products. Check that scrap is weighed and valued, not just written off, and that saleable by-products enter stock.
  • 5. The Tally question. Decide whether accounts stay in Tally. If they stay, see a live sync, and ask what happens when an entry fails.
  • 6. Use on the shop floor. Supervisors must be able to enter output in a minute from a phone, in Odia or Hindi where needed, with patchy network.
  • 7. Data and code ownership. Agree in writing who owns the database, the source code for custom work and the server logins.
  • 8. Support during month-end. Ask who answers when dispatch stops at 7 PM on the last day of the month.

How Do We Build Your Manufacturing ERP?

We start on one line, prove it with your own data, and only then extend the system to the rest of the plant.

1

Discovery & Process Mapping

We walk your shop floor, stores and dispatch, collect registers and job cards, and map where each number comes from. You get a written scope and estimate.

2

Build & Pilot Line

The first modules go live on one product line. Supervisors use them with real orders while we fix what does not fit the floor.

3

Data Migration & Parallel Run

Item masters, BOMs, opening stock and open orders are cleaned and loaded. The ERP runs alongside Tally and your sheets until at least one month-end closes with matching numbers.

4

Go-Live, Training & Support

The rest of the plant moves over, with training at each workstation. Support continues for fixes, reports and the next module.

Facts About SITS

Most of these you can check for yourself before you call.

Working Since 2013

12+ years of building software, apps and websites for businesses. Long enough to know where IT projects usually go wrong, and to plan around it.

5000+ Projects

For 1200+ clients, from small business websites to multi-module business software.

4.9★ Google Rating

Read our Google reviews before you decide. They say more than any page we could write.

An Office You Can Visit

Plot No. 746, Saheed Nagar, open Monday to Saturday. Meet the team before you pay anything.

Software, Apps & Support Together

The ERP, the Android app your supervisors use and the support after go-live come from one team, not three vendors to chase.

Show Us How Your Plant Runs

Bring one job card, one challan and the sheet you trust most, and we will show you where an ERP would change your day.

Frequently Asked Questions

About manufacturing ERP, and how we build it.

What is a manufacturing ERP?

A manufacturing ERP is software that runs a factory’s operations on one database: sales orders, bills of materials, production planning, stores, purchase, job work, quality, maintenance and dispatch, linked to accounts. Each department enters its own data once, so stock, order status and costs match across the plant without anyone retyping figures from registers or spreadsheets.

Which modules should a small manufacturer start with?

Start with stores and inventory, BOM and production entries, because every other report depends on stock and consumption being right. Add purchase next if bills often differ from orders, and job work early if a lot of material sits with job workers. Quality, maintenance and detailed planning can follow once the first modules run cleanly for a few month-ends.

Can a manufacturing ERP work alongside Tally?

Yes. Many plants keep Tally for accounts and GST returns while the ERP runs orders, production, stores and dispatch. Sales, purchase and stock entries are sent to Tally automatically, so your accountant keeps working the familiar way. Agree early how failed syncs are reported and who fixes them, because a silent mismatch at year-end is costly.

How does ERP handle job work and ITC-04?

The ERP records each delivery challan to a job worker, every return against that challan, and any loss or waste in processing. It ages each lot against the one-year limit for inputs and three-year limit for capital goods under the CGST Act. The same challan data is summarised for Form GST ITC-04, which your CA can review before filing.

Is custom manufacturing ERP better than a ready-made product?

Neither is better in general. A ready-made product suits a plant whose process matches its standard flow and whose team can adapt to it. Custom software suits plants with unusual routings, two-way job work, by-products or customer-specific quality checks. A common middle path is a ready-made core with custom modules for the parts that make your plant different.

How long does it take to roll out ERP in a factory?

It depends on the number of modules, how clean your item and BOM data is, and how much time supervisors can give. A phased rollout is safer than a single switch-over: one pilot line first, then a parallel run until at least one month-end matches, then the rest of the plant. We give a written timeline after the discovery visit.

Talk to Us About Your Plant’s ERP

Tell us what you make, roughly how many people work in the plant, and what runs on Tally or Excel today. The form below opens WhatsApp with your message filled in. You can also call, or come to Saheed Nagar.

Contact Information

Our Office

Plot No. 746, Saheed Nagar, Bhubaneswar, Odisha 751007

Business Hours

Mon – Fri: 9:30 AM – 8:00 PM
Sat: 8:00 AM – 8:00 PM · Sun: closed