Manufacturing Execution System (MES) Software Development in Bhubaneswar
We build custom MES software that manages production scheduling, real-time shop floor tracking, job card management, machine utilisation monitoring, quality inspection workflows and OEE dashboards — connecting your factory floor to your boardroom. Built by Swadhin IT Solutions, Bhubaneswar.
Leading MES Software Development Company in Bhubaneswar
Swadhin IT Solutions builds manufacturing execution systems that Indian factory managers depend on every shift. We have delivered MES platforms for discrete manufacturing, process industries, job shops and assembly line operations with real-time production visibility from machine level to management level.
Our MES software is not a rebranded ERP module. It is purpose-built for the shop floor — handling operator inputs via rugged tablets, integrating with PLCs and SCADA systems, capturing cycle times automatically and providing live OEE calculations that drive continuous improvement on the factory floor.
- Production scheduling & planning
- Real-time shop floor tracking
- Job card & work order management
- Machine utilisation monitoring
- Quality inspection workflows
- OEE dashboard & analytics
- Material consumption tracking
- Downtime analysis reports
MES Features That Maximise Production Efficiency
Every module is engineered for real factory conditions — rugged interfaces, PLC integration and shift-based operations.
Production Scheduling
Drag-and-drop production scheduling with capacity constraints, machine availability and material readiness checks. Gantt chart view shows job sequences across work centres. Automatic rescheduling when priorities change or machines go down. Shift-wise planning with overtime visibility.
Shop Floor Tracking
Real-time production status from every work station. Operators log job start, completion and reject quantities on rugged tablets or barcode scanners. Live production counters display actual vs target output. Supervisors see bottleneck alerts and line balancing data instantly.
Job Card Management
Digital job cards replace paper travellers. Each job card carries the routing, BOM, quality parameters and operator instructions. Automatic time stamping at each operation. Job progress visible to planning, production and quality teams simultaneously. Batch and serial number traceability.
Machine Utilisation
Monitor machine running, idle and breakdown time in real time. Automatic data capture from PLC-connected machines or manual operator input for standalone equipment. Planned vs unplanned downtime classification with reason codes. Machine-wise utilisation reports for capital planning.
Quality Inspection
In-process and final inspection checklists built into the production flow. Operators cannot proceed to the next operation without quality sign-off. Defect logging with category, root cause and corrective action. SPC data collection at critical control points with automatic alerts for out-of-spec readings.
OEE Dashboard
Overall Equipment Effectiveness calculated automatically from availability, performance and quality data. Live OEE scores per machine, line and plant displayed on shop floor monitors. Drill down into the six big losses. Trend analysis shows improvement trajectories over weeks and months.
Visual Production Scheduling With Capacity Constraints
Our production scheduler displays all work orders on a Gantt chart across machines and work centres. Drag and drop to reschedule, split or merge jobs. The system automatically checks material availability, tooling requirements and operator skill matrix before confirming the schedule.
When a machine breaks down or a rush order arrives, the scheduler highlights affected jobs and suggests optimal rescheduling options. Shift handover reports are generated automatically with pending jobs, completed quantities and issues carried forward.
Real-Time OEE That Drives Continuous Improvement
The OEE dashboard calculates availability, performance and quality percentages for every machine in real time. Shop floor TV screens display live OEE scores so operators and supervisors see the impact of every stoppage and defect immediately.
Pareto charts of downtime reasons, reject categories and speed losses identify where improvement efforts should focus. Monthly OEE trend reports show whether your factory is getting better — with data to prove it to management and customers.
How We Build Your MES Software — 6 Steps
From factory walk-through to live production tracking — our proven delivery process for manufacturing software.
Factory Walk-Through & Process Study
We visit your plant, map production flows, identify data collection points and document every operation
UI/UX Design for Shop Floor
Rugged, touch-friendly interfaces for operators — large buttons, minimal steps, works with gloves
Core MES Development
Scheduling, tracking, job cards, quality and OEE modules built to your specific production process
Machine Integration & Testing
PLC, SCADA, barcode and IoT sensor integration. Parallel testing with live production data
Operator Training & Go-Live
Hands-on training for operators, supervisors and managers. Go-live support on the shop floor
Support & Optimisation
3-12 months free support. Performance tuning, new machine additions and feature enhancements
Custom MES vs SAP ME vs Spreadsheet Tracking — Which Works Best?
See how a custom SITS MES compares to enterprise and manual alternatives for Indian manufacturers.
| Feature | Custom (SITS) | SAP ME / Siemens | Spreadsheet Tracking |
|---|---|---|---|
| Real-time shop floor data capture | ✓ Live tracking | ✓ Available | ✗ Delayed entry |
| Implementation time | ✓ 8-16 weeks | ✗ 12-24 months | ✓ Immediate |
| PLC / SCADA integration | ✓ Custom protocols | ✓ Standard protocols | ✗ Not possible |
| Indian GST & compliance | ✓ Built-in | ~ Localisation needed | ~ Manual |
| Cost for mid-size factory | ✓ Affordable | ✗ Very expensive | ✓ Free |
| OEE auto-calculation | ✓ Real-time | ✓ Available | ~ Manual formulas |
| Source code ownership | ✓ 100% yours | ✗ Licensed | ~ Your files |
Every Factory Is Different — Get a Custom Quote
Your MES cost depends on the number of machines, work centres, integration complexity, production volume and your specific manufacturing process. Call us for a free consultation and a transparent, fixed-price quote with no hidden charges.
MES Projects We Have Delivered
Real manufacturing execution systems built for real Indian factories — from job shops to high-volume production lines.
SchedulingProduction Scheduler for Auto Parts
Drag-and-drop production scheduling across 40 CNC machines with capacity constraints, material checks and automatic rescheduling on breakdowns. Reduced schedule adherence gap by 25%.
Automotive
TrackingReal-Time Shop Floor Tracker
Barcode-based production tracking across 6 work centres. Live production counters, operator performance dashboards and shift handover reports. 200+ operators using the system daily.
FMCG
QualityIntegrated Quality Inspection Module
In-process and final inspection checklists with SPC data capture at 12 critical control points. Automatic reject classification and CAPA initiation. Reduced customer complaints by 40%.
Pharma
OEEPlant-Wide OEE Dashboard
Real-time OEE monitoring for 80+ machines with PLC integration, downtime Pareto analysis and monthly improvement tracking. Improved plant OEE from 58% to 76% in 8 months.
Steel
Before SITS built our MES, we were running production on paper job cards and Excel sheets — we never had real-time visibility. Now every machine shows live status on the shop floor TV, our OEE has gone from 58% to 76%, and our planning team can reschedule in minutes instead of hours. The quality inspection module caught defects before they reached our customer. This system paid for itself in the first quarter.
Frequently Asked Questions — MES Software
Common questions from factory managers about our manufacturing execution system development services.
How much does MES software cost for a mid-size factory?
Can the MES integrate with our existing PLC and SCADA systems?
Will operators find the system difficult to use?
How is OEE calculated in your system?
Can the MES connect to our existing ERP system?
How long does MES implementation take?
Do you provide on-site support during go-live?
Is SITS based in Bhubaneswar? Can you serve factories across India?
Start Your MES Project Today
Get a free factory assessment and fixed-price quote from the leading MES development company in India. No obligation, no hidden charges.
Free MES Software Consultation
Tell us about your factory. Our team responds within 4 hours with a tailored solution approach and transparent quote.
Contact Information
Bhubaneswar, Odisha 751007